Directors’ Reports

This page will contain updates from each of the Directors on our Board. Updates will be provided as needed/appropriate, so not all Directors will update all the time.

Repeaters (Don Tolson) — Nov. 2025 — Due to lightning activity (we think) at the Mt. Cokely site, the VE7RPQ repeater is down. It may be a while before we can determine the problem, since access to the site is limited by the weather. We are using VE7RBB for the morning nets, etc. and Kelly (Ve7KGW) has reconfigured the Echolink to work through VE7RBB. As of Nov. 14th, the VE7RBB repeater has been reconfigured to accept signals from the remote bases.

The DMR Repeater is now (Nov. 14th) back on the air, as the VHF/UHF antennae upgrade at the Jensen Centre has been completed.

President’s Report (Dave Jones)

Secretary’s Report (Peter Tryon)

Membership Report (David Ireland) —

Treasurer’s Report (David Ireland) —